- Phase 30 launch plan (chrome-devtools-mcp-seo-brief.md, blog post) - SEO keyword brief (keywords.md with P0/P1 locked keywords) - Cognee workspace isolation eval + architecture deep-dive Co-Authored-By: PM <pm@agents.moleculesai.app>
2.4 KiB
Phase 30 Launch Plan — Chrome DevTools MCP SEO Campaign
Owner: Marketing Lead Status: Draft — CTAs + GA date TBD (blocked on engineering) Last updated: 2026-04-20
Campaign Status
| Deliverable | Owner | Status |
|---|---|---|
| SEO brief | Marketing Lead | ✅ Complete |
| Blog post | Marketing Lead | ✅ Complete |
| Keywords (P0/P1) | Marketing Lead | ✅ Confirmed |
| Keywords doc | Orchestrator | ✅ Created |
| Social distribution | Social Media Brand / Content Marketer | ⏳ Pending (both busy) |
| CTA links | Engineering | ⏳ TBD |
| GA date | Engineering | ⏳ TBD |
| SEO indexing | SEO Analyst | ⚠️ Unverified |
| Launch announcement | Content Marketer | ⏳ Pending |
Confirmed Content
- Brief:
docs/marketing/briefs/2026-04-20-chrome-devtools-mcp-seo-brief.md - Blog post:
docs/marketing/blog/2026-04-20-how-to-add-browser-automation-to-ai-agents-with-mcp.md - P0 keywords: "MCP browser automation", "Chrome DevTools MCP"
- P1 keywords: "AI agent browser control", "MCP protocol tutorial"
Pending Actions
CTA Links + GA Date
Blocked on: Engineering Action required: Engineering to provide:
- Final CTA URL for the blog post (e.g. demo, signup, docs link)
- GA date for the Chrome DevTools MCP feature
If blocked: Marketing Lead to escalate to PM for GA timeline.
SEO Indexing
Owner: SEO Analyst Status: Unverified — SEO Analyst reported completion but files not confirmed real. Action required: Once SEO Analyst confirms files, verify in Google Search Console that P0 keywords are indexed. Do not mark indexing complete until confirmed.
Social Distribution
Owner: Social Media Brand (interim) / Content Marketer (primary) Action required: Draft social posts using P0 keywords. Route to blog post CTA once engineering provides link.
Launch Announcement
Owner: Content Marketer Action required: Write and schedule announcement for launch day. Use confirmed keywords and blog post as source.
Open Questions
- GA date: Is there a confirmed ship date for Chrome DevTools MCP?
- CTA link: What is the primary conversion target for the blog post?
- SEO Analyst output: Where did their deliverables actually land?
Next Checkpoint
Review pending items in next marketing lead sync. Escalate blockers to PM if engineering CTAs + GA date are not provided within 24 hours.