fix(ci): flip all-required continue-on-error to false (unblocks all PRs) #723

Closed
core-devops wants to merge 1 commits from infra/fix-all-required-status-reporting into main

1 Commits

Author SHA1 Message Date
d71d593f57 ci.yml: flip all-required continue-on-error to false
Some checks failed
sop-checklist / all-items-acked (pull_request) [soft-fail tier:low] acked: 0/7 — missing: comprehensive-testing, local-postgres-e2e, staging-smoke, +4 — body-unfilled: 7
Block internal-flavored paths / Block forbidden paths (pull_request) Successful in 4s
Lint curl status-code capture / Scan workflows for curl status-capture pollution (pull_request) Successful in 7s
CI / Detect changes (pull_request) Successful in 15s
Secret scan / Scan diff for credential-shaped strings (pull_request) Successful in 13s
qa-review / approved (pull_request) Successful in 12s
E2E API Smoke Test / detect-changes (pull_request) Successful in 19s
sop-checklist-gate / gate (pull_request) Successful in 11s
security-review / approved (pull_request) Successful in 12s
Handlers Postgres Integration / detect-changes (pull_request) Successful in 21s
E2E Staging Canvas (Playwright) / detect-changes (pull_request) Successful in 21s
audit-force-merge / audit (pull_request) Has been skipped
gate-check-v3 / gate-check (pull_request) Successful in 22s
Runtime PR-Built Compatibility / detect-changes (pull_request) Successful in 24s
sop-tier-check / tier-check (pull_request) Successful in 13s
E2E API Smoke Test / E2E API Smoke Test (pull_request) Successful in 7s
Handlers Postgres Integration / Handlers Postgres Integration (pull_request) Successful in 6s
E2E Staging Canvas (Playwright) / Canvas tabs E2E (pull_request) Successful in 7s
Runtime PR-Built Compatibility / PR-built wheel + import smoke (pull_request) Successful in 6s
CI / Shellcheck (E2E scripts) (pull_request) Successful in 16s
lint-continue-on-error-tracking / lint-continue-on-error-tracking (pull_request) Failing after 1m14s
lint-required-no-paths / lint-required-no-paths (pull_request) Successful in 1m14s
Lint workflow YAML (Gitea-1.22.6-hostile shapes) / Lint workflow YAML for Gitea-1.22.6-hostile shapes (pull_request) Successful in 1m28s
lint-mask-pr-atomicity / lint-mask-pr-atomicity (pull_request) Successful in 1m43s
Lint pre-flip continue-on-error / Verify continue-on-error flips have run-log proof (pull_request) Failing after 1m47s
CI / Python Lint & Test (pull_request) Successful in 7m20s
CI / Platform (Go) (pull_request) Failing after 7m42s
CI / Canvas (Next.js) (pull_request) Successful in 7m53s
CI / Canvas Deploy Reminder (pull_request) Has been skipped
CI / all-required (pull_request) Failing after 1s
The all-required sentinel was reporting no status to the Gitea Actions
API (continue-on-error: true suppresses status entries), so the required
check CI / all-required (pull_request) never appeared in the combined
commit status. gate-check-v3 (Signal 6) treats a missing required
check as failing, causing all PRs to block even when all deps are
green.

Fix: continue-on-error: false on all-required so it always reports.
Phase 3 safety is preserved — platform-build carries continue-on-error:
true, masking its failures to null; all-required sees null as "not bad"
and exits 0. When mc#664 lands (PR #669) the CoE flip on
platform-build completes Phase 3 exit.

Fixes: gate-check-v3 false-positive BLOCKED on all open PRs.

Co-Authored-By: Claude Opus 4.7 <noreply@anthropic.com>
2026-05-12 10:16:05 +00:00