molecule-core/docs/edit-history/2026-04-15.md
Hongming Wang ba184dea5f docs: sync documentation with 2026-04-15 tick-9 merges (#79, #80)
- PLAN.md: new "Recently launched (2026-04-15 tick-9)" block covering
  Phase 32 Phase B.2 image pipeline (PR #80) + tick-8 docs (PR #79).
- docs/edit-history/2026-04-15.md: new file for today's merges.

Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
2026-04-14 16:43:00 -07:00

1.7 KiB

Edit history — 2026-04-15

tick-9: Phase 32 Phase B.2 image pipeline (PR #80) + tick-8 docs sync (PR #79)

Two merges:

PR #79 — docs: sync documentation with 2026-04-14 tick-8 merge (#78)

Merge commit d53a1287. Tick-8 docs sync for the TenantGuard middleware. Pure docs; CLAUDE.md test count + PLAN.md tick-8 block + edit-history entry.

PR #80 — feat(ci): publish-platform-image → ghcr.io/molecule-ai/platform (Phase B.2)

Merge commit c3cc8e87. Noteworthy: ci-infra.

Adds .github/workflows/publish-platform-image.yml:

  • Trigger: push to main touching platform/**; also workflow_dispatch.
  • Builds platform/Dockerfile via docker/build-push-action@v5.
  • Pushes two tags per run: ghcr.io/molecule-ai/platform:latest (floating) and :sha-<short-commit> (immutable, pin-friendly).
  • GHA cache via cache-from/cache-to: type=gha for warm rebuilds.
  • Permissions: contents:read + packages:write; authenticates to GHCR using the built-in GITHUB_TOKEN, no extra secrets.
  • OCI labels propagate source URL + commit SHA for provenance.

Purpose: pairs with the private molecule-controlplane Fly + Neon provisioner (PR #3 there, merged 2e85d5ad) which reads TENANT_IMAGE=ghcr.io/molecule-ai/platform:<tag> from env and spawns each tenant Fly Machine from this image.

Deployment state (informational — not in any repo)

  • Fly apps (molecule-cp, molecule-tenant): pending CEO (flyctl apps create).
  • Fly billing card: pending CEO.
  • First real tenant provision: blocked on the two above.

File deltas (public repo)

  • .github/workflows/publish-platform-image.yml — new.
  • CLAUDE.md — tick-9 block for the new CI workflow.
  • PLAN.md — new "Recently launched (2026-04-15 tick-9)" entry.