molecule-core/tests
rabbitblood f9b1b34956 fix(e2e): bump staging tenant TLS-readiness timeout 3min → 10min
Closes a 4+ cycle Canvas tabs E2E flake pattern that's been blocking
staging→main PRs since 2026-04-24+ (#2096, #2094, #2055, #2079, ...).

Root cause: TLS_TIMEOUT_MS=180s (3 min) is too tight for the layered
realities of staging tenant TLS readiness:

1. Cloudflare DNS propagation through the edge (1-2 min typical)
2. Tenant CF Tunnel registering the new hostname (1-2 min)
3. CF edge ACME cert provisioning + cache (1-3 min)

Each layer can add 1-3 min on its own under heavy staging load — the
realistic worst case is well past the 3-min cap.

Provision and workspace-online timeouts were already raised to 20 min
(staging-setup.ts:42-46 history). The TLS gate was the remaining
under-budgeted step. Bumping to 10 min keeps it inside the 20-min
PROVISION envelope so a genuinely-stuck tenant still fails loud at
the earlier provision step rather than masquerading as a TLS issue.

Both call sites raised together:
- canvas/e2e/staging-setup.ts: TLS_TIMEOUT_MS = 10 * 60 * 1000
- tests/e2e/test_staging_full_saas.sh: TLS_DEADLINE += 600

Each carries an inline rationale comment so the next reviewer sees
the layer-by-layer decomposition without re-reading the issue thread.

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-04-26 08:21:18 -07:00
..
e2e fix(e2e): bump staging tenant TLS-readiness timeout 3min → 10min 2026-04-26 08:21:18 -07:00
README.md chore: final open-source cleanup — binary, stale paths, private refs 2026-04-18 00:38:55 -07:00

Tests

This repo uses the standard monorepo testing convention: unit tests live with their package, cross-component E2E tests live here.

Where to find tests

Scope Location
Go unit + integration (platform, CLI, handlers) workspace-server/**/*_test.go — run with cd workspace-server && go test -race ./...
TypeScript unit (canvas components, hooks, store) canvas/src/**/__tests__/ — run with cd canvas && npm test -- --run
TypeScript unit (MCP server handlers) mcp-server/src/__tests__/ — run with cd mcp-server && npx jest
Python unit (workspace runtime, adapters) workspace/tests/ — run with cd workspace && python3 -m pytest
Python unit (SDK: plugin + remote agent) sdk/python/tests/ — run with cd sdk/python && python3 -m pytest
Cross-component E2E (spans platform + runtime + HTTP) tests/e2e/you are here

Why split this way

  • Go requires co-located _test.go files to access unexported symbols.
  • Per-package test commands keep the inner loop fast — changing canvas doesn't re-run Go tests.
  • tests/e2e/ covers scenarios that no single package owns: a full workspace lifecycle, A2A across two provisioned agents, delegation chains, bundle round-trips.

Running E2E

Every E2E script here assumes the platform is running at localhost:8080 and (where noted) provisioned agents are online. See the header comment of each .sh for specifics.

Cleaning up rogue test workspaces

If an E2E run aborts before its teardown runs (Ctrl-C, crash, CI timeout), the platform can be left with workspaces whose config volume is stale or empty — Docker's unless-stopped restart policy then spins those containers in a FileNotFoundError loop. The platform's pre-flight check (#17) marks such workspaces failed on the next restart, but a manual cleanup is useful:

bash scripts/cleanup-rogue-workspaces.sh               # deletes ws with id/name starting aaaaaaaa-, bbbbbbbb-, cccccccc-, test-ws-
MOLECULE_URL=http://host:8080 bash scripts/cleanup-rogue-workspaces.sh

The script DELETEs each matching workspace via the API and force-removes the ws-<id[:12]> container as a belt-and-suspenders fallback.